Multiple Choice
Several types of documentation must be prepared for a new system.The type of documentation that includes operating schedules and file retention requirements is called
A) development documentation.
B) operations documentation.
C) reference documentation.
D) user documentation.
Correct Answer:

Verified
Correct Answer:
Verified
Q1: Chuck in ITS got a call from
Q10: Phil in Marketing got a call from
Q46: In the file and database design step
Q47: Rules for writing programs are called<br>A)applications.<br>B)basic code.<br>C)common
Q49: The final step in the SDLC is
Q53: What is a post-implementation review? What are
Q54: What is the purpose of a conceptual
Q55: Some investigation must occur during the postimplementation
Q67: The accountant wants to make sure that
Q105: What output design considerations should be analyzed