Multiple Choice
What is a phase-in conversion?
A) both the old and new AIS are operated simultaneously
B) elements of the old AIS are replaced gradually with elements of the new AIS
C) the new AIS is introduced into one part of the organization,such as a branch
D) the old AIS is terminated as the new AIS is introduced
Correct Answer:

Verified
Correct Answer:
Verified
Q7: Which of the following is the most
Q12: What is the name for the type
Q13: Performing revisions to existing program code is
Q17: What are the controls design considerations in
Q18: Test transaction processing involves<br>A)managers observing the operation
Q19: Which of the following activities does not
Q20: Structured programming divides the program into small,well-defined
Q23: Effective AIS training involves<br>A)instruction on new hardware
Q28: Walk-throughs are system tests that involve<br>A)managers observing
Q85: Which consideration below is not considered important