Multiple Choice
What is a drawback to using the requirements costing method of software and hardware evaluation?
A) Dollar estimates of costs and benefits are not included.
B) Intangible factors such as reliability and vendor support are overlooked.
C) The weights and points used are assigned subjectively.
D) There is no drawback to using the requirements costing method.
Correct Answer:

Verified
Correct Answer:
Verified
Q18: Total costs are usually lower,and less time
Q21: Which of the following is a method
Q24: Software that automates aspects of the software
Q25: A formal invitation to vendors to submit
Q26: What are the guidelines for successfully purchasing
Q27: What factor underlies the seven principles of
Q28: Which statement below regarding prototyping is false?<br>A)A
Q30: Since the introduction of the computer,there has
Q31: CASE stands for<br>A)computer-aided software engineering.<br>B)computer-aided systems engineering.<br>C)both
Q33: There are four steps involved in developing