Multiple Choice
Which of the following is not a step in estimating total cost using the high-low method?
A) Identify the highest and lowest levels of activity.
B) Visually "fit" a line to the plotted points.
C) Compute the variable cost per unit.
D) Calculate the fixed cost using either the high point or the low point.
Correct Answer:

Verified
Correct Answer:
Verified