Quick Shop Printing has two workstations, cutting and pasting. The cutting station is limited by the speed of operating the cutting machine. Pasting is limited by the speed of the workers. Pasting normally waits on work from cutting. Each department works an eight-hour day. If cutting begins work two hours earlier than pasting each day, the two departments generally finish their work at about the same time. Not only does this eliminate the bottleneck, but it increases finished units produced each day by 80 units. All units produced can be sold even though the change increases inventory stock by 10 percent from 200 units. The cost of operating the cutting department two more hours each day is $800. The contribution margin of the finished products is $3 each. Inventory carrying costs are $0.20 per unit per day. What is the change in the daily contribution margin if the change is made?
A) $(396)
B) $(564)
C) $396
D) $400
E) $475
Correct Answer:

Verified
Correct Answer:
Verified
Q25: Harry's Picture manufactures various picture frames.Each new
Q49: A cause-and-effect diagram is used to help
Q51: How much will appraisal costs change assuming
Q54: Quality of design measures<br>A) how closely the
Q56: The International Standards Organization (ISO) certification registers
Q86: Brown Laundry has a variable demand. The
Q105: A company would subordinate all bottleneck production
Q134: On-time performance is<br>A)the time it takes distribution
Q137: Andrew Pallet Co., Inc.manufactures pallets for various
Q150: Answer the following question(s)using the information below.Quick