Multiple Choice
Which cost estimation method uses a formal mathematical method to develop cost functions based on past data?
A) The account analysis method
B) The conference method
C) The industrial engineering method
D) The quantitative analysis method
Correct Answer:

Verified
Correct Answer:
Verified