Multiple Choice
If machine maintenance is scheduled at a time when production is at a low level,then:
A) an understanding of operations is needed to determine an appropriate cost driver.
B) low production should be avoided since it is the cause of machine maintenance.
C) machine maintenance cannot be accurately predicted.
D) low production is the cost driver of high repair costs.