Products S5 and CP8 each are assigned $50.00 in indirect costs by a traditional costing system.An activity analysis revealed that although production requirements are identical,S5 requires 45 minutes less set-up time than CP8.
-According to an ABC system,CP8 is ________ under the traditional system.


A) under-costed
B) accurately costed
C) over-costed
D) fairly costed

Correct Answer: