Multiple Choice
A performance rating factor (PRF) of 1.15 means:
A) a worker is working at a pace that is 15 percent faster than normal.
B) a worker is working at a pace that is 15 percent slower than normal.
C) a worker is working at a pace that is 15 percent faster than standard time.
D) a worker needs to add 15 percent to the standard time.
Correct Answer:

Verified
Correct Answer:
Verified