Multiple Choice
A hinge manufacturing company employs a Kanban system for a component part. The daily demand is 900 hinges. Each container has a wait time of 0.05/day, and a processing time of 0.37 days. The container size is 60 hinges, and the safety factor (α) is 10%. Given this data, the number of Kanbans necessary for this system is _____.
A) less than 4 Kanbans
B) more than 4 but less than or equal to 8 Kanbans
C) more than 8 but less than or equal to 12 Kanbans
D) more than 12 but less than or equal to 16 Kanbans
Correct Answer:

Verified
Correct Answer:
Verified
Q4: Which of the following ideas related to
Q5: Shine Motor Inc. has decided to switch
Q6: Which one of the following statements is
Q7: Discuss the seven major categories of waste
Q8: Which of the following statements is TRUE
Q10: Single minute exchange of dies (SMED) frees
Q11: Webster Manufacturing Inc. is implementing a Just-in-Time
Q12: Six Sigma addresses visible problems in processes;
Q13: When producing broad goods or service mix
Q14: Explain the 5Ss.