Multiple Choice
Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations.
SHAPE \* MERGEFORMAT
Worksheet for assembly-line balancing problem
Use the previous assembly-line balancing (ALB) information to answer Questions .
-What is the cycle time?
A) 6 minutes/unit
B) 7 minutes/unit
C) 8 minutes/unit
D) 9 minutes/unit
Correct Answer:

Verified
Correct Answer:
Verified
Q3: Because of precedence relationships in a network,
Q4: An assembly line with 28 activities is
Q5: Explain the role of ergonomics in job
Q6: Cycle time in assembly-line balancing is the
Q7: In a _ team, members communicate by
Q9: A Gallup study showed that workers who
Q10: _ is vertical expansion of job duties
Q11: The facility layout in a library would
Q12: A product requires the following tasks
Q13: Explain the three types of teams effective