Multiple Choice
An assembly line with 28 operations is to be balanced. The total amount of time required for all 28 operations is 39 minutes. The longest operation takes 2.2 minutes and the shortest takes 0.8 minutes. The line will operate for 450 minutes per day.
1) Determine the minimum and maximum cycle time.
2) What is the output rate if the cycle time is set at 2.2 minutes?
A) min cycle time = 0.8; max cycle time = 39; output rate = 204.5
B) min cycle time = 2.2; max cycle time = 39; output rate = 204.5
C) min cycle time = 2.2; max cycle time = 31.2; output rate = 562.5
D) min cycle time = 0.8; max cycle time = 2.2; output rate = 562.5
Correct Answer:

Verified
Correct Answer:
Verified
Q25: The predominant layout type used in hospitals
Q26: _ layout is used for high volumes
Q27: _ is the horizontal expansion of a
Q28: An assembly line with 28 activities is
Q29: The production of large goods such as
Q31: Explain assembly-line balancing. Discuss the three types
Q32: Cycle time is related to the output
Q33: Ergonomics is the science that is concerned
Q34: An assembly line with 28 activities is
Q35: Process layouts generally require less investment in