Essay
A company makes traffic signals for downtown streets. They are interested in developing a product structure tree for one of their traffic signal models. Each traffic signal is composed of a housing and bracket assembly. Each housing assembly is composed of optical and casing subassemblies. Each bracket assembly is composed of a hanger part and a wire outlet part. The optical subassembly is composed of 4 wire lead subassemblies, 3 lens parts, 3 bulbs, and 3 socket parts. Each casing subassembly is composed of 3 plastic molds and 3 hardware subassemblies. Each wire lead subassembly is made up of 1 conductor part, 1 insulation part, and 4 spade connector parts. Each hardware subassembly is made up of 4 nuts, 4 bolts, and 8 washers.
a.How many spade connectors are needed to make one traffic signal?
b.How many bolts are needed to make one traffic signal?
Correct Answer:

Verified
Correct Answer:
Verified
Q1: The words "product family," "budget allocation," and
Q3: End items in a master production schedule
Q4: A paint company has the following
Q5: When demand is seasonal, inventory cannot be
Q6: Which aggregate planning strategy generally would result
Q7: Determine the net requirement for E if
Q8: What is capacity requirements planning (CRP)?
Q9: Explain the three levels of resource planning.
Q10: Which lot sizing rule is best when
Q11: Resources include materials, equipment, facilities, information, technical