Essay
Roseville Engineering provides watershed and design services for its customers.Total overhead costs this coming year are expected to be $8,000,000 ($2,000,000 in the Watershed Department,and $6,000,000 in the Design Department).If the company chooses to use the plantwide approach,overhead will be allocated using direct labor costs.Direct labor costs are expected to total $4,000,000.The Watershed Department expects to incur direct labor costs of $500,000,and the Design Department expects to work 120,000 direct labor hours.
a. Assume Roseville Engineering uses the plantwide approach to allocating overhead costs, and uses direct labor costs as the allocation base. Calculate the predetermined overhead rate and explain how this rate will be used to allocate overhead costs.
b. Assume Roseville Engineering uses the department approach for allocating overhead costs rather than the plantwide method. The Watershed Department allocates overhead based on direct labor costs and the Design Department allocates overhead based on direct labor hours. Calculate the predetermined overhead rate for each department and explain how these rates will be used to allocate overhead costs
Correct Answer:

Verified
a. The predetermined overhead rate using...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q42: Exhibit 3-1<br>Hydrate Inc.makes two types of sports
Q43: Exhibit 3-1<br>Hydrate Inc.makes two types of sports
Q44: Organizations that use activity-based costing to allocate
Q45: Exhibit 3-3<br>Metro Inc.has two production departments
Q46: Valor company is planning to implement
Q48: Overhead activities that are required to sustain
Q49: Exhibit 3-2<br>Dublin Pie Company sells cherry
Q50: As costing systems become more complex,they become
Q51: Kathy Edwards owns a landscape maintenance
Q52: Activity-based costing breaks total estimated overhead costs