The Xiang plant has two categories of overhead: maintenance and inspection. Costs expected for these categories for the coming year are as follows: The plant currently applies overhead using direct labour hours and expected capacity of 50,000 direct labour hours. The following data have been assembled for use in developing a bid for a proposed job: Total expected machine hours for all jobs during the year is 25,000, and the total expected number of inspections is 1,500.
Using direct labour hours to assign overhead, the total cost of the potential job would be
A) £2,500.
B) £5,500.
C) £4,000.
D) £4,500.
Correct Answer:

Verified
Correct Answer:
Verified
Q9: Define the terms cost objectives, cost pools,
Q13: Explain the key considerations in establishing cost
Q31: The following information pertains to Utter Company:
Q33: Explain the differences between direct assignment, driver
Q34: Figure 1<br>Harrison Co. produces two products, AB
Q37: Figure 4 Wheat Manufacturing has four categories
Q38: Zang Manufacturing Company manufactures two products (A
Q39: Predetermined overhead rate is calculated by<br>A) dividing
Q43: The calculation of unit costs is important
Q46: When actual overhead cost exceeds overhead applied