Multiple Choice
Spear Manufacturing has four categories of overhead. The four categories and expected overhead costs for each category for next year are as follows: Currently, overhead is applied using a predetermined overhead rate based upon budgeted direct labour hours. 20,000 direct labour hours are budgeted for next year.
The company has been asked to submit a bid for a proposed job. The plant manager feels that obtaining this job would result in new business in future years. Usually bids are based upon full manufacturing cost plus 15 percent. Estimates for the proposed job are as follows: In the past, full manufacturing cost has been calculated by allocating overhead using a volume-based activity driver, direct labour hours. The plant manager has heard of a new way of applying overhead that uses cost pools and activity drivers. Expected activity for the four activity drivers that would be used are:
If the number of inspections is used to assign inspection costs, the amount of inspection costs allocated to the proposed job would be
A) £2,700.
B) £990.
C) £900.
D) £540.
Correct Answer:

Verified
Correct Answer:
Verified
Q5: If activity-based costing is used, materials handling
Q33: Explain how the activity resource usage model
Q49: The Evans Company uses an ABC system
Q51: Describe several of the major differences between
Q52: Moss Ltd. has the following activities: creating
Q53: The proportion of an overhead activity consumed
Q55: Zipp Company manufactures two products (X and
Q56: If activity-based costing is used, security is
Q58: Quint Manufacturing uses an activity-based costing system.
Q59: When a firm acquires the resources needed