Multiple Choice
Owens Ltd. produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed: The costs of facility-level activities are assigned using machine hours.
What is(are) the batch-level activity(ies) ?
A) engineering
B) setups
C) inspecting
D) all of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q3: Activity-based costing assigns costs to cost object
Q5: If activity-based costing is used, materials handling
Q6: An example of a nonunit-level driver is<br>A)pounds
Q38: All of the following are unit-based activity
Q55: Zipp Company manufactures two products (X and
Q56: If activity-based costing is used, security is
Q58: Quint Manufacturing uses an activity-based costing system.
Q59: When a firm acquires the resources needed
Q61: The Xiang plant has two categories of
Q64: In a pure activity-based cost system, which