Multiple Choice
Owens Ltd. produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed: The costs of facility-level activities are assigned using machine hours.
What is(are) the facility-level activity(ies) ?
A) providing utilities
B) providing space
C) inspecting
D) both a and b
Correct Answer:

Verified
Correct Answer:
Verified
Q14: Basing overhead allocation solely on volume<br>A)will undercost
Q15: What is the initial step in implementing
Q23: Resources that are only purchased precisely at
Q49: If activity-based costing is used, insurance on
Q57: Briefly discuss the problem with the unit-level
Q85: Figure 1 A company usually processes 20,000
Q87: Ernest, SA., has identified the following overhead
Q89: Zipp Company manufactures two products (X and
Q91: _ is(are) the cost of acquiring activity
Q92: Spear Manufacturing has four categories of overhead.