Multiple Choice
Owens Ltd. produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity cost drivers for each activity have been identified and their practical capacities listed: The costs of facility-level activities are assigned using machine hours.
What is the cost pool rate for the facility-level activities?
A) £80.00 per machine hour
B) £13,500.00 per setup
C) £17.20 per machine hour
D) £97.20 per machine hour
Correct Answer:

Verified
Correct Answer:
Verified
Q13: Discuss how volume-based unit-level analysis underestimates and/or
Q39: Green, Inc., has identified the following overhead
Q41: Lyons, SA., has identified the following overhead
Q42: Figure 2<br>The management of Chott Industries predicted
Q45: King Manufacturing has four categories of overhead.
Q46: Owens Ltd. produces specially machined parts. The
Q47: Product costs can be distorted if a
Q48: Refer to Figure 1 in the previous
Q49: The Evans Company uses an ABC system
Q52: If activity-based costing is used, product inspections