Multiple Choice
Figure 4
Wheat Manufacturing has four categories of overhead. The four categories and the expected overhead costs for each category for next year are as follows:
Currently, overhead is applied using a predetermined overhead rate based upon budgeted direct labour hours. For next year, 20,000 direct labour hours are budgeted.
The company has been asked to submit a bid for a proposed job. The plant manager feels that obtaining this job would result in new business in future years. Usually bids are based upon full manufacturing cost plus 15 percent.
Estimates for the proposed job are as follows:
In the past, full manufacturing cost has been calculated by allocating overhead using a volume-based cost driver--direct labour hours. The plant manager has heard of a new way of applying overhead that uses cost pools and cost drivers.
Expected activity for the four activity-based cost drivers that would be used are as follows:
-Refer to Figure 4. If Wheat Manufacturing used activity-based cost drivers to assign overhead and the company's bid is full cost plus 15 percent, the company's bid would be
A) £12,696.00
B) £13,965.60
C) £10,120.00
D) £9,936.00
Correct Answer:

Verified
Correct Answer:
Verified
Q12: An example of a production or unit-level
Q16: Products might consume overhead in different proportions
Q21: Which of the following items would be
Q46: If activity-based costing is used, setups would
Q47: Which of the following items would be
Q66: _ are those that are acquired from
Q67: Figure 4<br>Wheat Manufacturing has four categories of
Q70: Greem, Inc., has identified the following overhead
Q75: Moss Ltd. has the following activities: creating
Q76: Moss Ltd. has the following activities: creating