A Performance Rating Factor (PRF) of 1.15 means
A) The worker is working at a pace that is 15% faster than normal
B) The worker is working at a pace that is 15% slower than normal
C) The worker is working at a pace that is 15% faster than standard time
D) The worker needs to add 15% to the standard time