Jones Furniture Company produces beds and desks for college students.The production process requires carpentry and varnishing.Each bed requires 6 hours of carpentry and 4 hour of varnishing.Each desk requires 4 hours of carpentry and 8 hours of varnishing.There are 36 hours of carpentry time and 40 hours of varnishing time available.Beds generate $30 of profit and desks generate $40 of profit.Demand for desks is limited,so at most 8 will be produced.
Let X1 = Number of Beds to produce X2 = Number of Desks to produce
The LP model for the problem is
MAX: 30 X1 + 40 X2
Subject to: 6 X1 + 4 X2 ≤ 36 carpentry)
4 X1 + 8 X2 ≤ 40 varnishing)
X2 ≤ 8 demand for desks)
X1,X2 ≥ 0
-You have been given the following linear programming model.
MAX: 8 X1 + 5 X2
Subject to: 3 X1 + 5 X2 = 54
11 X1 + 10 X2 ≤ 144 X1 / X2 ≥12
X1,X2 ≥ 0
This formulation:
A) can be solved without preprocessing using LP
B) cannot be solved using LP
C) requires that the third constraint be first converted to a linear form: X1 - 12 X2 ≤ 0
D) must be first converted to a minimization problem
Correct Answer:

Verified
Correct Answer:
Verified
Q7: The "Analyze Without Solving" tool in Analytic
Q22: A company needs to purchase several new
Q27: Robert Hope received a welcome surprise in
Q28: Pete's Plastics manufactures plastic at plants
Q30: Project 3.1 − The Diet Problem: Ordering
Q31: A company is planning production for
Q34: Microsoft Excel contains a built-in optimizer called<br>A)
Q49: What action is required to make Analytic
Q56: What function is used to add the
Q83: Scaling problems<br>A) can cause Analytic Solver Platform