Essay
Custom Cedar Products (CCP) manufactures a line of outdoor furniture. In May, CCP received an order Outdoor Spaces for 20 thirty inch planter. The order from Outdoor Spaces became Job 2100 at CCP.
A Materials requisition for Job 2100 is presented in the following section. In addition to the materials requisition, the labour time records (partial) or the week that these tables were made are presented. Other products were also being produced during that week, so not all labour belongs to Job 2100, but all labour belonging to Job 2100 is shown.
Requirements:
1. Calculate the total for the Materials Requisition form. Post the information from the Materials Requisition form to the Job Cost Record.
2. Complete the labour time records for each of the employees and post the information to Job 2100 to the Job Cost Record.
3. Complete the Job Cost Record.
Correct Answer:

Verified
Correct Answer:
Verified
Q114: When job costing is used at a
Q306: Use the information below to answer the
Q307: Which of the following is most likely
Q308: Although service firms do not carry large
Q309: If manufacturing overhead has been overallocated during
Q310: Which of the following entries would be
Q312: The cost of direct materials used in
Q313: Which comes first in the flow of
Q314: Use the information below to answer the
Q316: Use the information below to answer the