Essay
A job had a normal time of 2.43 minutes, an allowance of 20% and a forecast demand of 120 units per day.How long should it take to produce one day's output?
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q2: Predetermined time standards are advantageous since they
Q13: Consider the following time study data. <img
Q14: A method of randomly observing work over
Q15: A Performance Rating Factor (PRF) of 130%
Q17: The outputs from a work measurement study
Q19: Predetermined time standards are<br>A)Macronotions<br>B)Available in books and
Q21: Discuss several factors that can affect the
Q23: Based on data from a work sampling
Q42: When timing a work activity with multiple
Q55: Define and relate normal time and standard