Multiple Choice
Safety Products currently outsources an electrical switch that is a component in its sprinkler systems.The switches are purchased for $20 each.The company is considering making the switches internally and has conducted a study to determine the costs involved.The costs below are projected annual production costs: Assume that the company needs 15,000 of the switches,which would be produced in three batches.Assume also that the company will still be operating within the relevant range.If Safety decides to make the parts under these conditions,the total relevant costs will be:
A) $132,500.
B) $162,500.
C) $105,000.
D) $142,500.
Correct Answer:

Verified
Correct Answer:
Verified
Q143: Select the term from the list provided
Q144: Alex brought his lunch today but now
Q145: Sunk costs:<br>A) are not considered when evaluating
Q146: Only variable costs are relevant for decision
Q147: Discuss why qualitative characteristics must be considered
Q149: What are constraints? Provide an example.
Q150: Select the incorrect statement regarding sunk costs.<br>A)
Q151: The Enhanced Products Division of Forrest
Q152: Chavez Company is considering purchasing new
Q153: Which of the following statements is incorrect?<br>A)