In evaluating the current situation, the ____________ is the percentage of normal capacity at which the company is currently operating.
A) point of departure
B) amount of subcontracting needed
C) magnitude of the change
D) duration of the change
E) rated capacity
Correct Answer:

Verified
Correct Answer:
Verified