Multiple Choice
Speedy Dress Manufacturing has two workstations, cutting and finishing. The cutting station is limited by the speed of operating the cutting machine. Finishing is limited by the speed of the workers. Finishing normally waits for work from cutting. Each department works an eight-hour day. If cutting begins work two hours earlier than finishing each day, the two departments generally finish their work at about the same time. Not only does this eliminate the bottleneck, but also it increases finished units produced each day by 210 units. All units produced can be sold even though the change increases inventory stock by 15% from 430 units. The cost of operating the cutting department two more hours each day is $1430. The contribution margin of the finished products is $12 each. Inventory carrying costs are $0.50 per unit per day.
What is the change in the daily contribution margin if the change is made?
A) $684
B) $703
C) $1058
D) $715
Correct Answer:

Verified
Correct Answer:
Verified
Q137: Examples of nonfinancial measures of quality include
Q138: Venlaz Corp makes small motorcycles. The monthly
Q139: Cysco Corp has a budget of $1,202,000
Q140: A control chart identifies potential causes of
Q141: As per control charts, random variations would
Q143: Which of the following is an advantage
Q144: Two common operational measures of time are
Q145: Prevention costs include inspection and product testing.
Q146: Which of the following is a chart
Q147: Manufacturing cycle times affect both revenues and