Multiple Choice
Which of the following provides an explanation of why the variable overhead rate is separated from the fixed overhead rate in standard costing?
A) There is no justifiable reason; their separation is merely to simplify entries.
B) Both calculations divide by the same direct labor hours, but the numerator is different for each calculation.
C) The variable overhead rate is calculated using actual direct labor hours, whereas the fixed overhead rate is calculated using normal capacity direct labor hours.
D) Different application bases are generally appropriate.
Correct Answer:

Verified
Correct Answer:
Verified
Q60: Variance analysis involves computing the difference between
Q75: If the actual amount of direct materials
Q99: Even if a variance is insignificant, corrective
Q100: One drawback of using standard costing is
Q102: The variable overhead spending variance is also
Q105: Powerhorse, Inc., manufactures steel hitches for horse
Q106: Using the labor time standard of
Q107: Harrison, Inc., has computed direct labor standards
Q108: The direct materials price standard is a
Q115: A flexible budget is a summary of