Multiple Choice
The overhead variance is equal to the difference between
A) fixed overhead costs and flexible overhead costs.
B) estimated overhead rate and applied overhead rate.
C) actual overhead costs and variable overhead costs.
D) actual overhead costs and standard overhead costs.
Correct Answer:

Verified
Correct Answer:
Verified
Q21: "The difference between actual hours worked and
Q88: Once standard costs for direct materials, direct
Q89: The direct labor efficiency variance is the
Q90: The Lennon Company uses a standard costing
Q92: Using the standard costs of $5 per
Q94: The direct labor rate variance is the
Q95: Which of the following statements is not
Q96: The direct materials price standard is determined
Q97: In a standard costing system, standard costs
Q115: A flexible budget is a summary of