The San Jose Corporation uses two materials in the production of its product. The materials, G and H, have the following standards: During June, the following actual production information was provided:
What is the materials yield variance?
A) $6,000 (F)
B) $6,000 (U)
C) $18,000 (U)
D) $18,000 (F)