Multiple Choice
Figure 4-19 Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
Refer to 4-19. What is (are) the facility-level activity(ies) ?
A) set-ups
B) inspecting
C) providing space
D) both a and b
Correct Answer:

Verified
Correct Answer:
Verified
Q30: An activity-based costing system uses which of
Q46: Which of the following is NOT a
Q84: Forest Queen Manufacturing has four categories of
Q86: Figure 4-20 Quasi-Tech Corporation produces specially machined
Q93: Figure 4-21 Appleby Manufacturing uses an activity-based
Q94: Figure 4-10 The Manoli Company has collected
Q113: In the time-driven ABC systems, managers<br>A)assign resources
Q132: After-the-fact simplification includes two approaches: the approximately
Q177: The activity _ is a simple list
Q199: The Magnanimous Company uses a predetermined overhead