Multiple Choice
Figure 4-19 Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
Refer to Figure 4-19. What is (are) the product-level activity(ies) ?
A) engineering
B) setups
C) inspecting
D) all of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q14: Product costs can be distorted if a
Q34: Product classification attributes define and describe activities
Q58: Management information systems can be divided into
Q80: The method that first traces costs to
Q88: Time driven activity-based costing (TDABC) requires the
Q92: If unit-based product costing is used, which
Q109: Assume the following: Actual overhead costs equaled
Q145: A(n) _ method first traces costs to
Q146: Figure 4-10 The Manoli Company has collected
Q147: Figure 4-5 The Brookstone Company produces 9