Multiple Choice
Figure 4-20 Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers: Owens produces two models: Model X and Model Y. The following table shows how the two products consume activity.
Refer to Figure 4-20. Determine the engineering costs assigned to model C using the two most expensive activities for cost pools. The costs of the two relatively inexpensive activities are allocated to the two most expensive activities in proportion to their costs. (Round to two decimal places.) The engineering cost assigned to model C would be
A) $2,819,930
B) $1,566,666.67
C) $566,666.67
D) $313,330
Correct Answer:

Verified
Correct Answer:
Verified
Q11: The following information is provided by the
Q12: _ drivers create distortions when different products
Q13: Bienvenue, Inc., has identified the following overhead
Q14: Figure 4-12 The Gardenview Corporation has identified
Q15: Figure 4-8 Tandem Company manufactures two products
Q18: Figure 4-2 The following information is provided
Q19: The use of _ activity drivers to
Q21: The system that first traces costs to
Q106: If overhead is a significant proportion of
Q148: Activity-based costing uses only unit-level drivers for