Figure 4-20 Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers: Owens produces two models: Model X and Model Y. The following table shows how the two products consume activity.
Refer to Figure 4-20. First determine the overhead costs assigned to model D using the two most expensive activities for cost pools. The costs of the two relatively inexpensive activities are allocated to the two most expensive activities in proportion to their costs. (Round to two decimal places.) The engineering cost assigned to model D would be
A) $626,650.
B) $1,253,320.
C) $1,879,970.
D) $3,133,333.33.
Correct Answer:

Verified
Correct Answer:
Verified
Q26: Activity _ helps management achieve objectives such
Q56: A list of the activities identified in
Q94: Figure 4-10 The Manoli Company has collected
Q95: Figure 4 - 3 The records of
Q97: Figure 4-22 The Wellness Clinic is considering
Q100: Figure 4-21 Appleby Manufacturing uses an activity-based
Q103: Figure 4-6 The Fast & Furious Company
Q104: Figure 4-12 The Gardenview Corporation has identified
Q126: Tarot Company has a predetermined overhead rate
Q188: The activity-based cost assignment is the most