Four products (1,2,3,and 4) must be processed on one of four machines (A,B,C,and D) .The times required in minutes for each product on each machine are shown below.
If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 3 is assigned to
A) machine A.
B) machine B.
C) machine C.
D) machine D
Correct Answer:

Verified
Correct Answer:
Verified
Q17: What is the difference between infinite scheduling
Q33: The process of prioritizing jobs that have
Q34: The sequencing rule that minimizes average tardiness
Q59: Scheduling is considered the last stage of
Q60: With drum-buffer-rope (DBR),the bottleneck resource is always
Q66: If a job is ahead of schedule,then
Q67: If the following jobs are sequenced according
Q68: Scheduling specifies when labor,equipment,and facilities are needed
Q93: Job shop scheduling is also known as
Q98: All sequencing rules strive to optimize both