Multiple Choice
The total overhead cost variance is equal to the difference between
A) fixed overhead costs and variable overhead costs.
B) estimated overhead rate and applied overhead rate.
C) actual overhead costs and variable overhead costs.
D) actual overhead costs and standard overhead costs.
Correct Answer:

Verified
Correct Answer:
Verified