Multiple Choice
Blackwelder Factory produces two similar products - small lamps and desk lamps. The total plant overhead budget is $640,000 with 400,000 estimated direct labor hours. It is further estimated that small lamp production will require 275,000 direct labor hours and desk lamp production will need 125,000 direct labor hours. Using the single plantwide factory overhead rate with an allocation base of direct labor hours, how much factory overhead will be allocated to the small lamp production if the actual direct hours for the period is 285,000?
A) $275,000
B) $285,000
C) $440,000
D) $456,000
Correct Answer:

Verified
Correct Answer:
Verified
Q25: Determine the activity-based cost for each tape
Q29: Activity cost pools are assigned to products,
Q34: Scoresby Co. uses 3 machine hours and
Q35: If selling and administrative expenses are allocated
Q36: The total factory overhead for Big Light
Q37: All of the following can be used
Q40: Panamint Systems Corporation is estimating activity costs
Q41: The Aleutian Company produces two products, Rings
Q41: Activity cost pools are cost accumulations associated
Q44: The Transformations Hair Salon uses an activity-based