Figure 4-19 Owens Corporation produces specially machined parts.The parts are produced in batches in one continuous manufacturing process.Each part is custom produced and requires special engineering design activity (based on customer specifications) .Once the design is completed, the equipment can be set up for batch production.Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed.Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting.In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space.Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
-
Refer to Figure 4-19.What is (are) the unit-level activity(ies) ?
A) engineering
B) setups
C) inspecting
D) machining
Correct Answer:

Verified
Correct Answer:
Verified
Q27: If activity-based costing is used, electricity usage
Q32: Common measures of production activity include<br>A) units
Q49: If activity-based costing is used, insurance on
Q54: In a time-driven ABC system, once the
Q77: Figure 4-17 Moss Corporation has the following
Q79: All of the following are non-unit-based activity
Q82: Figure 4-16 Newman Company recently installed an
Q84: Figure 4-10 The Emmanuele Company has collected
Q85: Kramer Company has decided to use a
Q86: Figure 4-21 Jones Manufacturing uses an activity-based