Multiple Choice
Figure 4-19 Owens Corporation produces specially machined parts.The parts are produced in batches in one continuous manufacturing process.Each part is custom produced and requires special engineering design activity (based on customer specifications) .Once the design is completed, the equipment can be set up for batch production.Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed.Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting.In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space.Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
-
Refer to 4-19.What is (are) the facility-level activity(ies) ?
A) providing utilities
B) providing space
C) inspecting
D) both a and b
Correct Answer:

Verified
Correct Answer:
Verified
Q20: The use of unit-based activity drivers to
Q30: An activity-based costing system uses which of
Q114: Which of the following is NOT a
Q121: Figure 4-14 Spear Manufacturing has four categories
Q122: Figure 4-8 Zipp Company manufactures two products
Q124: Figure 4-21 Jones Manufacturing uses an activity-based
Q125: Figure 4-6 Cabrini Company produces two products:
Q128: Unit-based product costing uses which of the
Q131: Unit-level product costing assigns<br>A) direct materials and
Q144: Which of the following quantities is an