Multiple Choice
Figure 4-20 Owens Corporation produces specially machined parts.The parts are produced in batches in one continuous manufacturing process.Each part is custom produced and requires special engineering design activity (based on customer specifications) .Once the design is completed, the equipment can be set up for batch production.Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed.Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting.Costs have been assigned to each activity using direct tracing and resource drivers: Owens produces two models: Model X and Model Y.The following table shows how the two products consume activity.
-Refer to Figure 4-20.Determine the engineering costs assigned to model X using the two most expensive activities for cost pools.The costs of the two relatively inexpensive activities are allocated to the two most expensive activities in proportion to their costs.(Round to two decimal places.) The engineering cost assigned to model X would be
A) $313,330
B) $566,666.67
C) $1,566,666.67
D) $2,819,930
Correct Answer:

Verified
Correct Answer:
Verified
Q27: If activity-based costing is used, modifications made
Q75: The overhead rates of the traditional functional-based
Q114: Which of the following is NOT a
Q116: Figure 4-9 Winter Manufacturing has four categories
Q117: Long Industries uses a job-order costing system.The
Q119: Figure 4-8 Zipp Company manufactures two products
Q121: Figure 4-14 Spear Manufacturing has four categories
Q122: Figure 4-8 Zipp Company manufactures two products
Q124: Figure 4-21 Jones Manufacturing uses an activity-based
Q125: Figure 4-6 Cabrini Company produces two products: