Figure 4-20 Owens Corporation produces specially machined parts.The parts are produced in batches in one continuous manufacturing process.Each part is custom produced and requires special engineering design activity (based on customer specifications) .Once the design is completed, the equipment can be set up for batch production.Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed.Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting.Costs have been assigned to each activity using direct tracing and resource drivers: Owens produces two models: Model X and Model Y.The following table shows how the two products consume activity.
-Refer to Figure 4-20.Determine the overhead costs assigned to model Y using the two most expensive activities for cost pools.The costs of the two relatively inexpensive activities are allocated to the two most expensive activities in proportion to their costs.(Round to two decimal places.) The engineering cost assigned to model Y would be
A) $626,650.
B) $1,253,320.
C) $1,879,970.
D) $3,133,333.33.
Correct Answer:

Verified
Correct Answer:
Verified
Q54: The Data Maintenance Corporation provided the following
Q55: Figure 4-10 The Emmanuele Company has collected
Q56: Figure 4-10 The Emmanuele Company has collected
Q57: Figure 4-20 Owens Corporation produces specially machined
Q60: Figure 4-21 Jones Manufacturing uses an activity-based
Q61: Figure 4-21 Jones Manufacturing uses an activity-based
Q62: Figure 4-11 Yang Manufacturing Company manufactures two
Q63: Figure 4-4 Erickson Company made the following
Q122: Activity-based costing assigns cost to cost objects
Q202: In an approximately relevant ABC system<br>A)all activities