Solved

Figure 4-20 Owens Corporation Produces Specially Machined Parts

Question 17

Multiple Choice

Figure 4-20 Owens Corporation produces specially machined parts.The parts are produced in batches in one continuous manufacturing process.Each part is custom produced and requires special engineering design activity (based on customer specifications) .Once the design is completed, the equipment can be set up for batch production.Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed.Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting.Costs have been assigned to each activity using direct tracing and resource drivers:
Figure 4-20 Owens Corporation produces specially machined parts.The parts are produced in batches in one continuous manufacturing process.Each part is custom produced and requires special engineering design activity (based on customer specifications) .Once the design is completed, the equipment can be set up for batch production.Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed.Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting.Costs have been assigned to each activity using direct tracing and resource drivers:   Owens produces two models: Model X and Model Y.The following table shows how the two products consume activity.    -Refer to Figure 4-20.Using the activity ratios for engineering and machining, what is the overhead cost assigned to the engineering pool? (round to two decimal places)  A)  $1,880,000 B)  $2,620,000 C)  $2,740,000 D)  $2,870,000 Owens produces two models: Model X and Model Y.The following table shows how the two products consume activity.
Figure 4-20 Owens Corporation produces specially machined parts.The parts are produced in batches in one continuous manufacturing process.Each part is custom produced and requires special engineering design activity (based on customer specifications) .Once the design is completed, the equipment can be set up for batch production.Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed.Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting.Costs have been assigned to each activity using direct tracing and resource drivers:   Owens produces two models: Model X and Model Y.The following table shows how the two products consume activity.    -Refer to Figure 4-20.Using the activity ratios for engineering and machining, what is the overhead cost assigned to the engineering pool? (round to two decimal places)  A)  $1,880,000 B)  $2,620,000 C)  $2,740,000 D)  $2,870,000
-Refer to Figure 4-20.Using the activity ratios for engineering and machining, what is the overhead cost assigned to the engineering pool? (round to two decimal places)


A) $1,880,000
B) $2,620,000
C) $2,740,000
D) $2,870,000

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions