Assume a normal costing system.Calculate the predetermined overhead rate based on the following assumptions:
Assume a normal costing system.Calculate the predetermined overhead rate based on the following assumptions:   A) $9.00 per machine hour B) $10.00 per machine hour C) $9.375 per machine hour D) $10.42 per machine hour


A) $9.00 per machine hour
B) $10.00 per machine hour
C) $9.375 per machine hour
D) $10.42 per machine hour