Multiple Choice
Assessing the design effectiveness of the internal control system involves:
A) determining if the controls are appropriate.
B) determining if the controls operate as designed.
C) determining who is responsible for internal control.
D) All of the above.
Correct Answer:

Verified
Correct Answer:
Verified
Q33: Why are analytical procedures a required step
Q34: The three sections or groups of audit
Q35: Detection risk is:<br>A) the possibility that a
Q36: Auditors do not provide absolute assurance in
Q37: If the auditor initially considers the internal
Q39: The engagement letter:<br>A) must be generated before
Q40: The integrity of management plays a key
Q41: If the auditor decides that the internal
Q42: GAAS refers to:<br>A) ten auditing standards grouped
Q43: Which assertion(s) is met if proper cut-off