As per the typology developed by Shenhar and Dvir, system scope ranged from _____ that included projects that dealt with building a single component, to _____ that included a wide dispersal of interactive systems and subsystems.
A) array projects; system projects
B) system projects; array projects
C) assembly projects; array projects
D) array projects; assembly projects
E) system projects; assembly projects
Correct Answer: