Multiple Choice
The auto repair shop of Empire Motor Sales uses standards to control labor time and labor cost in the shop. The standard time for a motor tune-up is 2.5 hours. The record showing time spent in the shop last week on tune-ups has been misplaced; however, the shop supervisor recalls that 50 tune-ups were completed during the week and the controller recalls that the labor rate variance on tune-ups was $87, favorable. The shop has a set standard labor rate of $9 per hour for tune-up work. The total labor variance for the week on tune-up work was $93, unfavorable.
-The number of actual hours spent on tune-up work last week was:
A) 125 hours
B) 105 hours
C) 145 hours
D) Cannot be computed without further information
Correct Answer:

Verified
Correct Answer:
Verified
Q93: The following materials standards have been established
Q94: The auto repair shop of Empire Motor
Q95: Snuggs Corporation makes a product with the
Q96: The following labor standards have been
Q97: Arrow Industries uses a standard cost system
Q99: Jardell Corporation makes a product with the
Q100: Arrow Industries uses a standard cost system
Q101: When more hours of labor time are
Q102: The standards for product C54L specify 4.5
Q103: Vitko Corporation makes automotive engines.For the most