Multiple Choice
Lo-crete produces quick setting concrete mix.Production of 200,000 tons was started in April,190,000 tons were completed.Material costs were $3,152,000 for the month while conversion costs were $591,000.There was no beginning work-in-process;the ending work-in-process was 70% complete.What is the cost of the product that was completed and transferred to finished goods?
A) $3,610,000.
B) $3,555,850.
C) $2,994,400.
D) $3,743,000.
Correct Answer:

Verified
Correct Answer:
Verified
Q55: Operation costing is a hybrid system used
Q64: The basic cost flow model is:<br>A) BB
Q65: Fab Co.manufactures textiles.Among Fab's 2012 manufacturing costs
Q67: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2418/.jpg" alt=" For Case (A)above,what
Q67: The basic cost flow model is:<br>A) BB
Q68: The following direct labor information pertains to
Q72: Acme,Inc.had overhead of $310,000 during the year
Q74: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2418/.jpg" alt=" For Case (A)above,what
Q93: Which of the following is the correct
Q141: For which of the following businesses would