Multiple Choice
Lo-crete produces quick setting concrete mix.Production of 200,000 tons was started in April,190,000 tons were completed.Material costs were $3,152,000 for the month while conversion costs were $591,000.There was no beginning work-in-process;the ending work-in-process was 70% complete.What is the cost of the product that remains in work-in-process?
A) $591,000.
B) $131,005.
C) $187,150.
D) $133,000.
Correct Answer:

Verified
Correct Answer:
Verified
Q12: The following information has been gathered for
Q14: "Beginning Balance (BB)plus Transfers Out (TO)equals Ending
Q15: The predetermined manufacturing overhead rate for 2012
Q17: The following direct labor information pertains to
Q19: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2418/.jpg" alt=" For Case (B)above,what
Q20: Slurpy produces soft drinks and sodas.Production of
Q21: A system that mass-produces a single,homogenous output
Q38: In general,indirect costs are allocated,while direct costs
Q68: Regression analysis can be used to estimate
Q115: Which of the following statements is (are)true