Multiple Choice
A random sample of 80 companies who announced corrections to their balance sheets took a mean time of 8.1 days for the time between balance sheet construction and the complete audit.The standard deviation of these times was 1.3 days.What is the critical value for = .001 to test the claim that is greater than 7.5 days.
A) 2.575
B) 3.09
C) -1.96
D) -2.575
E) -3.09
Correct Answer:

Verified
Correct Answer:
Verified
Q46: If a null hypothesis is rejected at
Q80: When conducting a hypothesis test about a
Q99: Testing H<sub>0</sub>: µ = 32 versus
Q101: A recent study conducted by the
Q102: When testing a hypothesis about a
Q103: When the null hypothesis is true, there
Q104: Based on a random sample of
Q105: It is estimated that the average person
Q107: In testing H<sub>0</sub>: p <span
Q108: Based on a random sample of 25