The delay between receipt of raw materials and the availability of the finished goods produced from them is _____________. For the whole system, ____ should be as short as possible.


A) production time (PT) / PT
B) regular time (RT) / RT
C) over time (OT) / OT
D) throughput time (TPT) / TPT
E) tech time (TT) / TT